Hydropower engineers unite in Canberra for technical exchange and Snowy 2.0 site visit - International Water Power

Hydropower Engineers Unite in Canberra

More than 110 hydropower specialists from Australia, New Zealand, Malaysia, and Canada gathered in Canberra for the Hydro Power Engineering Exchange (HPEE), hosted by Snowy Hydro.

The biennial event, held from October 19–23, included three days of technical presentations and discussions at QT Canberra, as well as a site visit to the Snowy 2.0 pumped storage hydro project – Australia’s largest renewable energy development.

No specific quotes available in the given text.

Author's summary: Hydropower specialists gathered in Canberra for HPEE.

more

International Water Power & Dam Construction International Water Power & Dam Construction — 2025-10-29

More News